Road Asset Inventory

Blog·

Kerb line vs carriageway edge: how to tell them apart in aerial imagery

A brick footway runs beside a stone wall, separated from a curving road by a kerb line.

Anyone who has sat with an orthophoto and a digitizing tool has hit this problem: the kerb line and the carriageway edge are two different features that, from directly overhead, can produce the same dark-to-light transition. Get the two confused and your width calcs are wrong, your footway polygons overlap the carriageway, and whoever inherits the register has to re-walk sections you already paid to survey.

The distinction matters more than it looks like it should, because most asset registers key everything else off it. Carriageway area, surface condition banding, channel line location for drainage surveys, all of it traces back to where you drew that one edge.

What the kerb line actually marks

The kerb line is the physical upstand, the vertical face of the kerb unit where it meets the channel. On a standard urban cross-section that's the line between the running surface and the footway or verge. In imagery it shows up as a shadow line, usually a half-pixel to a pixel wide at 0.3 m GSD, sitting just inboard of the true edge of the carriageway. Where there's a dropped kerb for a driveway or a dished channel at a junction, that shadow thins out or disappears for a few metres, which is exactly where people miscount the boundary.

Kerb returns at junctions are their own trap. The radius curves inward sharply and the shadow can read as a gap in the carriageway rather than a tight bend in it, especially on lower-resolution capture or when the sun angle flattens the shadow out.

Where the carriageway edge sits instead

The carriageway edge is the outer limit of the trafficked surface, the actual asphalt or concrete boundary. On a kerbed road, that edge sits right at the kerb face, so the two lines are close enough that at coarse resolution they look identical. On an unkerbed rural road, they're not close at all. The carriageway edge there is the surface-to-verge break, a soft, often ragged line where chip seal gives way to gravel or grass, with no shadow to anchor it. Lay-bys, informal passing places and verge erosion all shift that edge year to year without touching a kerb line at all, because there isn't one.

This is the case that trips up anyone extracting boundaries from imagery alone: on unkerbed roads you're not choosing between two close lines, you're finding one soft line with nothing hard to lock onto.

Why aerial imagery blurs the two

A few things stack up against a clean call. Tree canopy overhang on rural routes shadows the verge and the carriageway edge together, so the real boundary sits somewhere under the crown and you're guessing at its position from the canopy shape instead. Wet pavement after rain darkens both the running surface and a gravel verge to a similar tone, killing the contrast that would normally separate them. And resurfacing projects routinely widen the carriageway by a few centimetres into the old channel, so an older orthophoto and a current one can genuinely disagree on where the edge sits, not because anyone misread it but because the road moved.

Getting it right in the extraction workflow

The reliable rule is to treat kerb line and carriageway edge as two separate features from the start, never one line inferred from the other. On kerbed sections, extract the kerb face and offset the carriageway edge to it rather than guessing a parallel line by eye. On unkerbed sections, extract the carriageway edge directly from the surface-to-verge contrast and don't force a kerb attribute onto a road that doesn't have one. Junctions and kerb returns need a tighter vertex spacing than straight runs, because that's where a coarse polyline cuts the corner and quietly shaves metres off the true carriageway area.

This is the part of building a register that eats the most review time when it's done by hand off aerials, because every junction and every unkerbed stretch needs a judgment call. Road Asset Inventory runs that extraction across your whole network and hands back carriageway, footway and kerb features as GIS layers you can seed straight into the register, rather than a set of lines someone has to eyeball twice.

If you're about to start digitizing a network's carriageway boundaries by hand, it's worth seeing what a biennial extraction run would have handed you instead.

Start a pilot